was successfully added to your cart.

Explaining how the A591 will be repaired

By 18th December 2015Uncategorised

Explaining how the A591 will be repaired, Dr Ferley says: “What I envisage we will end up with is a reinforced concrete structure, a sort of inverted T-shape with the head of the T at the bottom sitting on the rock, reinforced concrete wall cantilevering from that, and above that and behind that new engineered fill to support the road.” #lakedistrict #gettingthejobdone

Leave a Reply